The kitchen is one of those areas where it is well settled down and proved to be a material suitable for roughing. DIY does not take much work to do drywall ceiling in the kitchen with his hands. Consider stages theatre odnourovnevoho installation of drywall ceiling in the kitchen, which is mounted to the ceiling material thickness of 8 mm. Does not matter what you do first wall or ceiling. The most important thing to be able to fasten theatre to the wall profile UD, which goes around the perimeter of the room.
Here are materials theatre that are required for installing a suspended ceiling, drywall sheets. theatre Using water or laser level set at the corners label at the bottom theatre of which should be part of the frame. And in one corner of the label on each side to be able to make marking thread. Reflective marking thread line with these tags. The vertical distance from the line to the lowest point of the ceiling should be at least 3-4 cm.
First set around the perimeter profile UD. It is usually theatre holes for screws, but if not, then fasten it to the wall 40-50 cm. Reflected line must pass through the bottom of the profile. UD dock can overlap. Now, are determined with the direction of stacking sheets of drywall.
Mark sheets back toward the wall at UD 50 cm. Between labels, wall to wall, mirror on the ceiling line with the same marking thread. It held Profiles CD. On the lines fastened to the ceiling mounting bracket so that it falls on the center section theatre of the line. Bending staples letter P. The distance theatre between them should not exceed 40-50 cm.
Under them, from wall to wall, insert a UD profile CD. While nothing is fastened, just insert. Doing it all profiles. Tighten all straps them, just pidhynayuchy under each profile that they were bent.
Now stretch the thread from wall to wall across profiles CD, this ukruchuyemo UD screws in each side. The thread wound on them. So we got a guide for profiles CD. Then fasten each profile on one of the staples using small screws (flea beetles) in terms stretched thread. Just fix flea beetles CD at the edges, prykruchuyuchy theatre them to UD.
When all of the items displayed on the level, anchoring profiles to the rest of the clip, which ends up simply turn down or sideways. Please note that we do not set the transverse elements. Area any kitchen theatre is relatively small, so the drywall joints is quite simply screwed inside pieces of CD.
Plasterboard ceilings in the kitchen are not normally without lights, so that they began screwed plasterboard sheets to figure out how the lighting will be located. When you have decided with the lighting, do the wiring harness to them. Wires preferably buried in a special corrugated channel.
Begin installation of the equal angle kitchen, however, it must be provided for mounting the frame. In a letter spend about 60 drywall screws for metal length of 25 mm. Before you hang the letter next to fasten to the edges already theatre established mail pieces CD so that part fell on a nearby leaf. These pieces prykruchuyutsya on the back side.
So we avoid the need to mount transverse profiles CD. As with lighting in the kitchen theatre issues resolved in the previous step, you derive the wire to fixtures in the identified areas. If the lights are ear, the holes are better cut immediately after installing letters to putty.
Administration is not responsible for the content of materials, placing theatre users. For the settlement of disputes and claims you can contact the site. Published on this site may contain information intended for users over 18 of the Law "On protection of children from information harmful to their health and development." 18+.
FRESH Blog How to cut drywall? 3 ways of cutting Dernova land or roof Type of sewage for private house: advantages and tips on installation theatre Using glue Linoleum docking it seams Pasting wall wallpaper
We have implemented a model of accumulation and storage of verified information with the questions that this information is responsible. Add my knowledge everyone can. Answers and questions to them established authors who have registered on the site and editors checked for compliance with regulations.
No comments:
Post a Comment